Monitoring

Victron Battery Balancer wiring diagram

Review how the Victron Battery Balancer connects, how it operates and which installation requirements apply to this model.

Open this example as a new project. Use your own parts and cable lengths to make the plan yours.

Connection and installation overview

Requires two series-connected batteries and a live midpoint; a generic single-battery two-wire monitor example cannot represent its topology.

Requires two series-connected batteries and a live midpoint; a generic single-battery two-wire monitor example cannot represent its topology.

Show sizes in mm²

Wiring diagram

How the Battery Balancer is wired.

Open this example in Crimp to use your own parts and cable lengths. Review the assumptions and installation notes as you adapt the circuit.

Victron Battery Balancer wiring example with 1 components: Battery Balancer. 0 cable connections. Crossings are not junctions.Victron Battery Balancer. Requires two series-connected batteries and a live midpoint; a generic single-battery two-wire monitor example cannot represent its topology. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.Battery Balancer
Victron Battery Balancer wiring example with 1 components: Battery Balancer. 0 cable connections. Crossings are not junctions.Requires two series-connected batteries and a live midpoint; a generic single-battery two-wire monitor example cannot represent its topology. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.Scroll sideways to inspect all components and connections.
Edit this connection overview

Installation notes

Connections and installation requirements.

Guidance for this model, with sources linked beside the relevant advice.

Verified against the manufacturer's documentation (rev. Manufacturer two-page manual, downloaded 2026-10-01), checked 2026-10-01. Manufacturer documentation →

What one unit balances

One Battery Balancer equalizes the two 12 V batteries in a 24 V series bank. It begins operating above 27.3 V and stops below 26.6 V. Its balancing current, up to 0.7 A, is small compared with propulsion or inverter current; it cannot repair an undersized, damaged or mismatched battery. Three units are used for the four batteries of a 48 V arrangement. See operating description, PDF p. 1.

Three battery connections

The negative lead goes to the bank negative, the positive lead to the bank positive, and midpoint to the series junction between batteries. Connect negative, positive, then midpoint, using at least 0.75 mm² cable. Do not connect midpoint to a chassis-grounded negative bus: it sits at the voltage of the lower battery. The catalog therefore exposes these as signal connections rather than a pass-through power bus.

Fuses and alarm contacts

For an installation requiring UL compliance, the manual specifies 10 A DC fuses in all three battery leads, close to the batteries. Other installation protection must still match the conductors and local requirements. The normally open alarm relay is rated 1 A at 60 V; its contacts need a separate supply to operate an indicator. Reset is a momentary external contact, not a power-input terminal. See connection order and specifications, PDF p. 2.

Check the imbalance under charge

Measure each battery while the bank is charging and the balancer is active. A 200 mV difference activates the alarm; it clears below 140 mV. Persistent imbalance after sufficient charging warrants checking individual battery condition and connection resistance. A quiet alarm with the bank below the activation voltage does not establish that the batteries are balanced.

Build it out

Connect it to the rest of your system.

Add Battery Balancer to your diagram, then connect your batteries, chargers and loads. Crimp calculates cable sizes and checks the connections as you draw.

Every cable you draw there is sized against ABYC E-11, from the same tables as the reference on this page.

Technical reference

Specifications, terminals and supporting parts.

Check the model, ratings and connection points against your own unit before choosing installation hardware.

Catalog specification

Compatible systems
24 V

Supporting parts

  1. A lug or terminal to match each post on the part
  2. Strain relief and boots so nothing chafes or shorts
  3. Cable and fuses sized once the whole system is drawn

Check stud sizes, fuse type, run length and how warm the space gets against the gear you actually have before you order.

Terminal map

Catalog connection points, current direction and planning limits. Check the manufacturer's pinout and connector ratings before installation.

BANK +

bank-pos

signal · bidi

—

MIDPOINT

midpoint

signal · bidi

—

BANK −

bank-neg

signal · bidi

—

ALARM

alarm-a

signal · bidi

1 A

ALARM

alarm-b

signal · bidi

1 A

RESET

reset-a

signal · bidi

—

RESET

reset-b

signal · bidi

—

A dash means a current rating is not specified here.

Method & provenance

Where the specifications and sizing come from.

Manufacturer specifications describe the equipment. Crimp calculates cable results from the circuit and assumptions you enter.

From the maker

What the catalog says

Manufacturer, model, ratings and which terminal does what come from the catalog. A newer revision, or the nameplate on the unit in your hand, can say something different — when it does, the nameplate wins.

ABYC E-11

What Crimp worked out

Sized against ABYC E-11 — the US reference, and what Transport Canada accepts as an alternative to TP 1332 for pleasure craft under 24 m. The run length and the current above are what drive the result. Crimp doesn't know how warm your space gets; draw the cable inside an engine-bay zone on the canvas and it sizes for the heat.

Read how the sizing works

Next step

Plan your installation with Battery Balancer.

Open this example as a new project. Add your equipment and cable lengths, then review the sizing and checks for your setup.