Charger
Schaudt EBL 119 House Charger wiring diagram
Limited representation of the EBL 119 mains-to-house-battery charging function: 230 V AC input and up to 18 A DC output. The real unit also contains distribution, starter charging and alternator switching, which this symbol does not model. Reviewed charging profiles are AGM and gel; it is not a lithium charger profile.
- Nominal voltage
- 12 V
- Compatible systems
- 12 V
- Rated output
- 18 A
Wiring diagram
How the EBL 119 is wired.
Open this example in Crimp to use your own parts and cable lengths. Review the assumptions and installation notes as you adapt the circuit.
Cable sizing for this example
Use the diagram as a starting point for your installation. Replace the example equipment and cable lengths with your own, and check the connections against your exact model's instructions.
10 ft one way
12 V system
- Wire
- 10 AWG · 6 mm²
- Example fuse
- 25 A
- Design current
- 18 A
- Voltage drop
- 2.7%
Sized against ABYC E-11. The design current is the unit's rated output. The length is one way; voltage drop includes an equal-length return.
Run-length and manufacturer assumptions
The editable example uses 3.048 m (10 ft) runs unless a shorter run is stated. Metric overviews round these to 3 m. Adapt the parts and lengths to your installation before choosing cable and protection.
Supporting parts
- 20 ft total of 10 AWG (6 mm²) marine cable
- Terminations for 10 AWG cable, matched to the equipment's screw terminals, leads or studs
- 25 A fuse and holder on the positive run
- Heat-shrink, strain relief and terminal boots sized to the cable
Check stud sizes, fuse type, run length and how warm the space gets against the gear you actually have before you order.
Installation notes
Before you install.
Open a question for model-specific guidance and sources.
Verified against the manufacturer's documentation (rev. 811.0421 BA / EN — 15.09.2015, EBL 119 / EBL 119 with OVP), checked 2026-10-01. Manufacturer documentation →
Which part of the EBL 119 is represented?
The EBL 119 is an integrated motorhome power unit containing a mains charger, distribution circuits and battery switching. This catalog entry deliberately covers only its mains-to-house-battery charging function: AC L/N/PE and house charging positive/negative. Starter-battery maintenance charging, alternator coupling, refrigerator branches, solar input and the control-panel harness are real functions described in the manual, pages 7–10, but are not connected or simulated by this symbol.
This limited model avoids turning controlled battery connections into a permanent parallel bus. It is not a replacement for the vehicle's complete EBL wiring plan. The overvoltage-protection feature belongs specifically to the OVP version, not every unit carrying an EBL 119 label.
What supplies and charging profiles are specified?
The technical data, pages 9–10, states 230 V AC ±10%, 47–63 Hz, 1.9 A input, and up to 18 A house-battery charging current. The 1.9 A figure is mains current; it is not 12 V consumption. Actual charging current falls with charge stage, battery acceptance and thermal conditions.
The reviewed profiles cover six-cell gel and AGM batteries of at least 80 Ah. Gel uses a 14.4 V absorption stage and AGM 14.7 V, followed by 13.7 V float; the listed absorption durations are 16 and 4 hours respectively. Select the correct profile with the system isolated as the manual instructs. No lithium profile is documented by this revision.
How do the terminals and protection relate to the full unit?
The catalog's `out-pos` and `out-neg` refer to the house-battery charging connection. The complete installation diagram, page 15, shows 50 A protection at each battery positive for the full integrated system, which also carries distribution and alternator currents. That 50 A figure must not be read as 50 A charger output, nor transferred blindly to an isolated 18 A charging-only design. Use the full EBL and vehicle wiring instructions when connecting a real unit.
AC protective earth must be connected as part of the mains installation. Keep the mains and DC routes distinct and have the mains circuit and protection checked by a qualified installer. The terminal envelopes here are the documented 1.9 A input and 18 A charging limits, not the ratings of every EBL internal bus or connector.
What should commissioning and fault checks include?
Verify battery polarity, chemistry selection, fuse positions and the compatible control panel before energizing. Keep ventilation open: page 6 describes automatic current reduction when the unit overheats. If house charging fails, check incoming mains and reduce competing loads before concluding that the charger has failed. A starter-battery or alternator fault must be diagnosed using the omitted full-system paths, not this charging-only model. For long storage, follow the battery charging and cutoff sequence; operating the cutoff can release the heater's frost valve and drain water.
Technical reference
Specifications and terminal map.
Check the model, ratings and connection points against your own unit before choosing installation hardware.
Catalog specification
Limited representation of the EBL 119 mains-to-house-battery charging function: 230 V AC input and up to 18 A DC output. The real unit also contains distribution, starter charging and alternator switching, which this symbol does not model. Reviewed charging profiles are AGM and gel; it is not a lithium charger profile.
- Nominal voltage
- 12 V
- Compatible systems
- 12 V
- Rated output
- 18 A
Terminal map
Catalog connection points, current direction and planning limits. Check the manufacturer's pinout and connector ratings before installation.
230V L
neutral · input
230V N
neutral · input
PE
ground · input
House +
positive · output
House −
negative · output
Sources and sizing method
Equipment specifications. Model details, ratings and terminal roles come from the catalog. Check your unit’s label and current manufacturer documentation for its exact revision.
Example sizing. Sized against ABYC E-11 — the US reference, and what Transport Canada accepts as an alternative to TP 1332 for pleasure craft under 24 m. Results use the example current and run length shown above. Set your actual equipment, lengths and installation conditions in Crimp before choosing hardware.
Read how the sizing worksNext step
Plan your installation with EBL 119.
Open this example as a new project, or add this component to your existing diagram. Use your equipment and cable lengths to review the sizing.
Free for up to 10 equipment components, with no account needed. Cables, busbars and fuse hardware do not count toward the limit. Your drawing saves in this browser. File exports are included with Crimp Pro.