D250SE (1044 / 40-315)

CTEK D250SE 20A wiring diagram

20A house-battery charger accepting alternator and solar input; 25A maximum input and a 23V solar open-circuit ceiling. Supports 12V lead-acid or LFP house banks and a lead-acid starter battery. A common earth connection and separate smart-alternator/profile wires complete the installation.

Nominal voltage
12 V
Compatible systems
12 V
Continuous draw
25 A

Wiring diagram

How the D250SE 20A is wired.

Open this example in Crimp to use your own parts and cable lengths. Review the assumptions and installation notes as you adapt the circuit.

CTEK D250SE 20A wiring example with 3 components: Starter bank, D250SE 20A, House bank. 4 cable connections. Crossings are not junctions.Starter bank + to D250SE 20A ALT +: 10 mm² · 30 A fuse, 3 m one way. D250SE 20A SERVICE + to House bank +: 10 mm² · 30 A fuse, 2 m one way. Starter bank − to D250SE 20A EARTH −: 10 mm², 3 m one way. D250SE 20A EARTH − to House bank −: 10 mm², 2 m one wayStarter bank + to D250SE 20A ALT +: 10 mm² · 30 A fuse, 3 m one wayD250SE 20A SERVICE + to House bank +: 10 mm² · 30 A fuse, 2 m one wayStarter bank − to D250SE 20A EARTH −: 10 mm², 3 m one wayD250SE 20A EARTH − to House bank −: 10 mm², 2 m one way12 V 200 Ah starter bankStarter bank++−−CTEK D250SE 20A. The example connects starter and house batteries through the D250SE, with solar disconnected. Both battery-positive paths use the manual's 30 A protection. The 2 m output uses 10 mm²; the 3.048 m input also uses 10 mm², above the table's 6 mm² minimum for runs up to 5 m. Verify battery chemistry, control wiring and protection location before installation.D250SE 20AALT +ALT +SERVICE +SERVICE +EARTH −EARTH −12 V 200 Ah house bankHouse bank++−−10 mm² · 30 A fuse10 mm² · 30 A fuse10 mm²10 mm²
CTEK D250SE 20A wiring example with 3 components: Starter bank, D250SE 20A, House bank. 4 cable connections. Crossings are not junctions.Red = positive · dark = return · dashed = signal. Cable labels are example values; use the equipment instructions and actual installation lengths.

The example connects starter and house batteries through the D250SE, with solar disconnected. Both battery-positive paths use the manual's 30 A protection. The 2 m output uses 10 mm²; the 3.048 m input also uses 10 mm², above the table's 6 mm² minimum for runs up to 5 m. Verify battery chemistry, control wiring and protection location before installation. Manufacturer installation manual

Edit this wiring example

Cable sizing for this example

Use the diagram as a starting point for your installation. Replace the example equipment and cable lengths with your own, and check the connections against your exact model's instructions.

2 m one way

12 V system

Wire
10 mm² · 8 AWG
Example fuse
30 A
Design current
20 A
Voltage drop
1.2%

Sized against ABYC E-11. The design current is the unit's rated output. The length is one way; voltage drop includes an equal-length return.

Run-length and manufacturer assumptions

The editable example uses 3.048 m (10 ft) runs unless a shorter run is stated. Metric overviews round these to 3 m. Adapt the parts and lengths to your installation before choosing cable and protection.

The example connects starter and house batteries through the D250SE, with solar disconnected. Both battery-positive paths use the manual's 30 A protection. The 2 m output uses 10 mm²; the 3.048 m input also uses 10 mm², above the table's 6 mm² minimum for runs up to 5 m. Verify battery chemistry, control wiring and protection location before installation. Manufacturer installation manual

Show sizes in AWG

Supporting parts

  1. 4 m total of 10 mm² (8 AWG) marine cable
  2. Terminations for 10 mm² cable, matched to the equipment's screw terminals, leads or studs
  3. 30 A fuse and holder on the positive run
  4. Heat-shrink, strain relief and terminal boots sized to the cable

Check stud sizes, fuse type, run length and how warm the space gets against the gear you actually have before you order.

Installation notes

Before you install.

Open a question for model-specific guidance and sources.

Verified against the manufacturer's documentation (rev. D250SE / SMARTPASS 120S UK English manual; models 1044 / 1058), checked 2026-10-01. Manufacturer documentation →

What does the D250SE do?

The CTEK D250SE charges a 12 V house battery from alternator power, solar, or both, with 20 A maximum output. Its 25 A input limit differs from that output rating. The starter battery must be lead-acid; the service bank can use a supported lead-acid or LFP profile.

Which terminals and fuses are required?

Connect alternator/start-battery positive to ALT +, panel positive to SOLAR +, service positive to SERVICE +, and returns to the common earth connection. The manual’s cable table specifies 30 A battery-side fuses and length-dependent conductors. The output table reaches 2 m using 10 mm²; route longer installations from a fresh conductor/drop assessment rather than extrapolating silently. Main M8 connections tighten to 8 Nm.

How are the control wires set?

The red smart-alternator lead needs the manual’s ignition connection when that mode is required. The black battery-select lead selects Normal, AGM or lithium behavior; follow the wiring combinations for the actual battery. Attach the supplied temperature sensor near the service battery’s positive post. These control/sensor wires are not represented as power terminals on the symbol.

What limits matter in use?

The solar array’s cold open-circuit voltage must stay below 23 V; panel watts alone cannot establish compatibility. Charging derates with temperature. Mount in ventilated surroundings and check source LEDs when output is absent. The unit lacks reverse-polarity protection and is not spark-free. A SMARTPASS adds a separate power path; it does not increase this converter’s own 20 A rating.

Technical reference

Specifications and terminal map.

Check the model, ratings and connection points against your own unit before choosing installation hardware.

Catalog specification

20A house-battery charger accepting alternator and solar input; 25A maximum input and a 23V solar open-circuit ceiling. Supports 12V lead-acid or LFP house banks and a lead-acid starter battery. A common earth connection and separate smart-alternator/profile wires complete the installation.

Nominal voltage
12 V
Compatible systems
12 V
Continuous draw
25 A
Rated output
20 A
PV open-circuit limit
23 V

Terminal map

Catalog connection points, current direction and planning limits. Check the manufacturer's pinout and connector ratings before installation.

ALT +

positive · input

25 A

SOLAR +

positive · input

25 A

SERVICE +

positive · output

20 A

EARTH −

negative · bidi

25 A
Sources and sizing method

Equipment specifications. Model details, ratings and terminal roles come from the catalog. Check your unit’s label and current manufacturer documentation for its exact revision.

Example sizing. Sized against ABYC E-11. Boats built to UK or EU rules answer to ISO 13297 — check these figures against it before you build. Results use the example current and run length shown above. Set your actual equipment, lengths and installation conditions in Crimp before choosing hardware.

Read how the sizing works

Next step

Plan your installation with D250SE 20A.

Open this example as a new project, or add this component to your existing diagram. Use your equipment and cable lengths to review the sizing.

Free for up to 10 equipment components, with no account needed. Cables, busbars and fuse hardware do not count toward the limit. Your drawing saves in this browser. File exports are included with Crimp Pro.