01
Battery to switch
C1 carries battery positive through the preliminary main-fuse choice to the on/off switch. C2 continues to the fuse block. The switch disconnects the loads; it does not protect a wire against overcurrent.
02
Fuse block to accessories
C4 supplies the lights and C6 supplies the electronics, each through a separate branch-fuse choice. The Blue Sea 5026 is a fuse block with a negative bus; two of its twelve circuits are used here.
03
Every load returns to the battery
C5 and C7 return from the loads to the block’s negative bus. C3 completes the path to battery negative. This drawing uses dedicated return wires; it does not use the hull as a return.
A bilge pump that must run with the main switch off needs a separate protected supply and its own controls. Navigation lights also need the correct switching arrangement for the boat. Neither is represented by the generic lights in this example.