Blue Sea Systems

Blue Sea 4152 SPDT Center-Off Switch connections

Review the Blue Sea 4152 SPDT Center-Off Switch connections, setup and installation requirements. This overview does not calculate cable or protection sizes.

Compatible systems
12 V

Connection overview

SPDT ON–OFF–ON connections.

See how this component fits into a system. Use the manufacturer’s installation instructions for the complete connections.

Blue Sea 4152 SPDT Center-Off Switch connection overview with 5 components: AGM 100, ATC inline fuse holder, SPDT ON–OFF–ON, Load A · 1A, Load B · 2A. 6 cable connections. Crossings are not junctions.AGM 100 + to ATC inline fuse holder IN. ATC inline fuse holder OUT to SPDT ON–OFF–ON COM. SPDT ON–OFF–ON A to Load A · 1A +. Load A · 1A − to AGM 100 −. SPDT ON–OFF–ON B to Load B · 2A +. Load B · 2A − to AGM 100 −AGM 100 + to ATC inline fuse holder INATC inline fuse holder OUT to SPDT ON–OFF–ON COMSPDT ON–OFF–ON A to Load A · 1A +Load A · 1A − to AGM 100 −SPDT ON–OFF–ON B to Load B · 2A +Load B · 2A − to AGM 100 −100 Ah AGM. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.AGM 100++−−ATC inline fuse holder. Illustrative inline holder, 0.1 m from battery. Verify the installed holder, fuse voltage and interrupt rating. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.ATC inline fuse holderINOUTBlue Sea 4152 SPDT Center-Off Switch. Select each contact position to inspect its circuit. An open or unselected branch is not evidence that its cable needs no protection. Momentary spring return is not timed. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.SPDT ON–OFF–ONCOMAABBExample load 1A. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.Load A · 1A+−Example load 2A. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.Load B · 2A+−
Blue Sea 4152 SPDT Center-Off Switch connection overview with 5 components: AGM 100, ATC inline fuse holder, SPDT ON–OFF–ON, Load A · 1A, Load B · 2A. 6 cable connections. Crossings are not junctions.Three-terminal changeover contact diagram. Select A, center off or B manually; verify the complete supply and return circuit, cable size and protection in every intended position. Connection overview only. Cable lengths are placeholders; use the complete manufacturer diagram to select conductors and protection. No automatic fuse or cable-size recommendation is supplied by this example.
Edit this connection overview

Technical reference

Specifications and terminal map.

Check the model, ratings and connection points against your own unit before choosing installation hardware.

Catalog specification

Three-contact 12 V changeover switch. COM connects to A or B; center off opens both. Rated 15 A at 12 V DC. Check each selected circuit separately; no automatic control is inferred.

Compatible systems
12 V

Terminal map

Catalog connection points, current direction and planning limits. Check the manufacturer's pinout and connector ratings before installation.

COM

neutral · bidi

15 A

A

neutral · bidi

15 A

B

neutral · bidi

15 A
Sources and sizing method

Equipment specifications. Model details, ratings and terminal roles come from the catalog. Check your unit’s label and current manufacturer documentation for its exact revision.

Connection overview. This diagram explains the connection arrangement; it does not calculate cable sizes or protection for the installation. Follow the manufacturer’s complete wiring and protection instructions.

Read how the sizing works

Next step

Plan your installation with SPDT ON–OFF–ON.

Open the connection overview as a new project, or add this component to a diagram you already have.

Start drawing, sizing and checking without an account. Your drawing saves in this browser. See Pricing for the equipment allowance and the one-time export offer available to you.